KitLog pro

Powered By Kitlog Pro v2.0

Matt & Val's 650B
' style=
Date:  5-13-2021
Number of Hours:  1.50
Manual Reference:  Engine
Brief Description:  Prep for 5th bearing install

I ordered the engine plug kit when i ordered the 5th bearing install kit.
SPA shipped it promply
Everything was in the tupperware box i needed to install the 5th bearing assembly.
' style=

Install kit and engine plugs

Install kit and engine plugs

' style=

Engine plugs installed

Engine plugs installed

' style=

Inventory of install kit tools

Inventory of install kit tools

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.