KitLog pro

Powered By Kitlog Pro v2.0

Matt & Val's 650B
' style=
Date:  5-2-2021
Number of Hours:  0.75
Manual Reference:  Engine Assembly
Brief Description:  Plastigage test prep.

Installed bearings in case journals.
Installed Crank
Torqued case halves together per manual
made sure not to move the crank
' style=

Bearings installed

Bearings installed

' style=

Plastigage cut and ready

Plastigage cut and ready

' style=

Case assembled and torqed

Case assembled and torqed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.