Powered By Kitlog Pro v2.0
Matt & Val's 650B
CH-650B
All
5-2-2021
< Previous Log Entry
Next Log Entry >
Date:
5-2-2021
Number of Hours:
0.75
Manual Reference:
Engine Assembly
Brief Description:
Plastigage test prep.
Installed bearings in case journals.
Installed Crank
Torqued case halves together per manual
made sure not to move the crank
Bearings installed
Plastigage cut and ready
Case assembled and torqed
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH-650B Home
Category
# Logs
# Hours
All
245
450
Electrical / Lights
3
8
Elevator
8
4
Engine
43
84
Flaps / Ailerons
27
47
Horizontal Stabalize
9
18
Kit Receipt / invent
4
18
Rudder
5
19
Rudder Workshop
5
19
Tools
12
16
Wings
117
197
Work benches
2
8
Work benchs
2
8
Workshop
8
4
Copyright © 2001-2024 Matronics. All Rights Reserved.