Powered By Kitlog Pro v2.0
Matt & Val's 650B
CH-650B
All
2-6-2021
< Previous Log Entry
Next Log Entry >
Date:
2-6-2021
Number of Hours:
2.00
Manual Reference:
6-w
Brief Description:
landing light & fuel tank
I riveted the landing light support structure to the nose rib.
put in about 3 gallons of fuel
I capped the ends and put a glove over the filler neck and pressurized with air.
I stood on end to make sure the fuel covered the sender, to check it's seal.
I'll check it tomorrow for leaks
Landing light frame attached
Fuel tank pressure test
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH-650B Home
Category
# Logs
# Hours
All
245
450
Electrical / Lights
3
8
Elevator
8
4
Engine
43
84
Flaps / Ailerons
27
47
Horizontal Stabalize
9
18
Kit Receipt / invent
4
18
Rudder
5
19
Rudder Workshop
5
19
Tools
12
16
Wings
117
197
Work benches
2
8
Work benchs
2
8
Workshop
8
4
Copyright © 2001-2024 Matronics. All Rights Reserved.