Powered By Kitlog Pro v2.0
Matt & Val's 650B
CH-650B
All
11-7-2020
< Previous Log Entry
Next Log Entry >
Date:
11-7-2020
Number of Hours:
1.50
Manual Reference:
6-w-10
Brief Description:
fitting right tank into LE bay area
it's a bit of trial and error to pit the tank in and out of the LE bay. It's hard to get the drain hols cut in a perfect position as the welded in drain tube is at an angle
first time dropped in
outboard vent hole drilled
checking gap for cork on ends
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH-650B Home
Category
# Logs
# Hours
All
245
450
Electrical / Lights
3
8
Elevator
8
4
Engine
43
84
Flaps / Ailerons
27
47
Horizontal Stabalize
9
18
Kit Receipt / invent
4
18
Rudder
5
19
Rudder Workshop
5
19
Tools
12
16
Wings
117
197
Work benches
2
8
Work benchs
2
8
Workshop
8
4
Copyright © 2001-2024 Matronics. All Rights Reserved.