Powered By Kitlog Pro v2.0
Matt & Val's 650B
CH-650B
All
11-6-2020
< Previous Log Entry
Next Log Entry >
Date:
11-6-2020
Number of Hours:
2.00
Manual Reference:
6-w-10
Brief Description:
fitting SW fuel sender in right tank
checking trimmed and bent float rod on my mocked up jig
i drilled a 57mm hole and added a small notch to the clamp ring to be able to fit it in the smaller hole
the smaller the hole, the more surface area available to seal to prevent leaks
float on bottom stop
float at upper stop
checking clamp ring fit
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH-650B Home
Category
# Logs
# Hours
All
245
450
Electrical / Lights
3
8
Elevator
8
4
Engine
43
84
Flaps / Ailerons
27
47
Horizontal Stabalize
9
18
Kit Receipt / invent
4
18
Rudder
5
19
Rudder Workshop
5
19
Tools
12
16
Wings
117
197
Work benches
2
8
Work benchs
2
8
Workshop
8
4
Copyright © 2001-2024 Matronics. All Rights Reserved.