KitLog pro

Powered By Kitlog Pro v2.0

Matt & Val's 650B
' style=
Date:  11-6-2020
Number of Hours:  2.00
Manual Reference:  6-w-10
Brief Description:  fitting SW fuel sender in right tank

checking trimmed and bent float rod on my mocked up jig

i drilled a 57mm hole and added a small notch to the clamp ring to be able to fit it in the smaller hole

the smaller the hole, the more surface area available to seal to prevent leaks
' style=

float on bottom stop

float on bottom stop

' style=

float at upper stop

float at upper stop

' style=

checking clamp ring fit

checking clamp ring fit

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.