Powered By Kitlog Pro v2.0
Matt & Val's 650B
CH-650B
All
7-4-2020
< Previous Log Entry
Next Log Entry >
Date:
7-4-2020
Number of Hours:
14.00
Manual Reference:
Brief Description:
engine inspection
after teardown and initial cleaning, it is much easier to closely inspect all of the engine details
there are several head studs that are excessively corroded and will need to be replaced
3302 distributor hold down hardware (stock) W.W offers a new stamped steel hold down clamp and hardware
Damaged head studs
Stock Distributor clamp
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH-650B Home
Category
# Logs
# Hours
All
245
450
Electrical / Lights
3
8
Elevator
8
4
Engine
43
84
Flaps / Ailerons
27
47
Horizontal Stabalize
9
18
Kit Receipt / invent
4
18
Rudder
5
19
Rudder Workshop
5
19
Tools
12
16
Wings
117
197
Work benches
2
8
Work benchs
2
8
Workshop
8
4
Copyright © 2001-2024 Matronics. All Rights Reserved.