Powered By Kitlog Pro v2.0
Matt & Val's 650B
CH-650B
All
3-28-2020
< Previous Log Entry
Next Log Entry >
Date:
3-28-2020
Number of Hours:
0.50
Manual Reference:
6W11-19
Brief Description:
Rear Spar drilling
Continued drilling the rear spar and doublers. Piloted everything, then drilled full size
6W11-20 needs to be trimmed, even after the overlap area.
Areas that need joggles (IMHO)
Joggle area needed
Joggle needed
Everything Drilled
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH-650B Home
Category
# Logs
# Hours
All
245
450
Electrical / Lights
3
8
Elevator
8
4
Engine
43
84
Flaps / Ailerons
27
47
Horizontal Stabalize
9
18
Kit Receipt / invent
4
18
Rudder
5
19
Rudder Workshop
5
19
Tools
12
16
Wings
117
197
Work benches
2
8
Work benchs
2
8
Workshop
8
4
Copyright © 2001-2024 Matronics. All Rights Reserved.