Powered By Kitlog Pro v2.0
Matt & Val's 650B
CH-650B
All
1-25-2020
< Previous Log Entry
Next Log Entry >
Date:
1-25-2020
Number of Hours:
5.00
Manual Reference:
6-W-1
Brief Description:
Starting L/H flap
Starting the L/H flap. process is a mirror of the R/H side
mark rivet lines on ribs
position inside skin, drill and cleco
enlarge holesfor a5 rivets.
I made the little plywood block to hold the sharpie for drawing the rivet lines. I just slide it across the work bench
Left flap parts laid out.
Rivet line marking tool
Left flap updrilling for a5 rivets
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH-650B Home
Category
# Logs
# Hours
All
245
450
Electrical / Lights
3
8
Elevator
8
4
Engine
43
84
Flaps / Ailerons
27
47
Horizontal Stabalize
9
18
Kit Receipt / invent
4
18
Rudder
5
19
Rudder Workshop
5
19
Tools
12
16
Wings
117
197
Work benches
2
8
Work benchs
2
8
Workshop
8
4
Copyright © 2001-2024 Matronics. All Rights Reserved.