KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  5-9-2013
Number of Hours:  7.00
Manual Reference:  20-4-2 to 20-4-4
Brief Description:  Flap and Aileron Gap Fairings

Initial assembly, drilling and countersinking of flap and aileron gap fairings. Work on 5/9 through 5/14.
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.