KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  10-4-2009
Number of Hours:  1.00
Manual Reference:  13-4-6 to 13-4-7
Brief Description:  Tie Downs

Fabricated the tie-downs and clecoed to the spar. Match drilled the holes from the spar into the tie-downs.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.