KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  8-7-2009
Number of Hours:  2.00
Manual Reference:  12-2, 12-3
Brief Description:  HS, VS Fairings

Finished up the HS fairings. I will still fill in the rivet heads and smooth over the transition from the skin to the fairing.

Pictures: DSC03783 - DSC03784
' style=





' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.