KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  10-3-2008
Number of Hours:  2.00
Manual Reference:  10-17-3
Brief Description:  Tailcone Alodining

Alodined some of the stiffeners. The Trays worked great for this purpose. I keep the solutions in 5 gallon jugs. To drain the trays, I just hold the jug up to the drain and open the valve. When the level is low, I have to tip up the tray to get the remaining liquid out. The jug gets heavy when full, an improvement would be a hose to drain into the jug.

Pictures: DSC03672 - DSC03673
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.