KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  6-25-2008
Number of Hours:  1.25
Manual Reference:  10-13-3 to 10-13-7
Brief Description:  Aft Deck

Match drilled the aft deck into the longerons. Match drilled the attachment bar support angle and the up elevator stop into the aft deck and longerons.

Pictures: DSC03653 - DSC03655
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.