KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  12-21-2007
Number of Hours:  2.00
Manual Reference:  9-6-7 to 9-7-3
Brief Description:  Elevator Drilling

Installed the trailing edge wedges and trimmed to fit. Reinstalled and drilled the trailing edges to the elevator skins. Drilled the closeout tabs to the shear clip. Clecoed and final drilled the elevator horns. Started final drilling the skins.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.