Powered By Kitlog Pro v2.0
Stevens Web Site
RV-7A
Empennage
4-12-2015
< Previous Log Entry
Next Log Entry >
Date:
4-12-2015
Number of Hours:
1.00
Manual Reference:
Elevators
Brief Description:
Drilling hole in the horn
Inserted the nylon bushing into the horizontal stabilizer hinge bracket assembly and drilled a pilot hole to #40. Removed the elevator and final drilled the hole to size.
Elevator horn
Final drilling
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
60
245
Empennage
55
241
Miscellaneous
1
0
Project Prep
4
4
Copyright © 2001-2024 Matronics. All Rights Reserved.