Powered By Kitlog Pro v2.0
Stevens Web Site
RV-7A
Empennage
2-8-2015
< Previous Log Entry
Next Log Entry >
Date:
2-8-2015
Number of Hours:
0.50
Manual Reference:
VS Drilling
Brief Description:
Prepared the VS ribs
Prepared the vertical stabilizer ribs by smoothing the edges and fluting them so the rivet hole were in a straight line. Then I clecoed the ribs to the front and rear spars.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
60
245
Empennage
55
241
Miscellaneous
1
0
Project Prep
4
4
Copyright © 2001-2024 Matronics. All Rights Reserved.