KitLog pro

Powered By Kitlog Pro v2.0

Stevens Web Site
' style=
Date:  1-28-2015
Number of Hours:  0.20
Manual Reference:  VS Drilling
Brief Description:  Drilling Rear Spar

Clecoed the vertical stabilizer spar doubler (VS-808PP) and the hinge brackets (VS-410PP, VS-411PP, and VS412PP) to the rear spar (VS-803PP).
' style=

Vertical stabilizer spar

Vertical stabilizer spar

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.