KitLog pro

Powered By Kitlog Pro v2.0

Daytons Web site
' style=
Date:  3-19-2006
Number of Hours:  3.00
Manual Reference:  Sec 6
Brief Description:  Re- Build Left Elevator

Section 6 Re-Building left elevator Date 3/18/06Today I started the re-build on my left elevator. The trailing edge was damage by a falling ladder while being storage in my hanger i.e. (hanger rash). The first order of business is to belt sand the top of my work bench to remove all bumps and areas that may scratch the new skin. (Image) 00-0335 &00-336
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.