Finished riveting aft deck area. Removed and replaced about 4 bad rivets. Match drilled indicated parts. Page 10-27. Fitted vertical stab, match drilled, and temporary bolts installed. Page 10-28. Prepared top skin by deburring and dimpling. Page 10-29.