KitLog pro

Powered By Kitlog Pro v2.0

Mitch Hodges (N601MH)
' style=
Date:  5-29-2007
Number of Hours:  0.90
Manual Reference:  Zenith Notes
Brief Description:  Add L at 8.5 to replace locker

Add line at 7th rivet and center between Ribs 8 and 9
Drill pilot holes with pitch matching other Ls
Drill holes between skin and L
Trim and shape L
' style=

Added L at 8.5 for Locker

Added L at 8.5 for Locker

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.