KitLog pro

Powered By Kitlog Pro v2.0

Mitch Hodges (N601MH)
' style=
Date:  9-7-1997
Number of Hours:  2.00
Manual Reference:  Page 7
Brief Description:  Drill and Rivet the Right Aileron

Building Sequence Phase I Step 5: Predrill holes, being sure to plan for rivets at the ribs, and setting the Aileron twist, per the instructions. Drill holes out to the correct size, debur and rivet.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.