Powered By Kitlog Pro v2.0
Tom's Rans S-19 Builders Log
S-19
Interior
6-27-2011
< Previous Log Entry
Next Log Entry >
Date:
6-27-2011
Number of Hours:
2.00
Manual Reference:
Brief Description:
Fitting of closeout bulkhead
Fitted closeout bulkhead as follows:
1. Performed rough trim to begin fitting.
2. Checked fit and trimed slides above longerons.
3. Drilled mounting holes from the rear, using cleco's to hold bulkhead in place. Removed bukhead and enlarged mounting holes.
4. Installed nutplates on bulkhead frame.
5. Checked final fit of bulkhead.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Home
Category
# Logs
# Hours
All
191
842
Ailerons
6
27
Avionics
3
6
Electrical System
2
26
Empennage
1
3
Engine
19
90
Final Assembly
24
118
Flaps
9
22
Fuel System
2
3
Fuselage
79
368
Interior
2
4
Landing Lights
3
17
Miscellaneous
1
5
Parts
1
2
Project
2
Vertical Stabilizer
3
3
Wings
34
148
Copyright © 2001-2024 Matronics. All Rights Reserved.