KitLog pro

Powered By Kitlog Pro v2.0

Tom's Rans S-19 Builders Log
' style=
Date:  7-31-2011
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Engine tachometer and alternator connections

Continued engine electrical system installation:

1. Connected tachometer cable to both the Dynon D-180 and the UMA electric tachometer.

2. Cut off "fast on" spade connections from Rotax alternator wiring and replaced with PIDG ring terminals. Connected terminals to firewall feed-thru capacitors that lead to voltage regulator/rectifier on cockpit side of firewall.

3. Functional testing will be done during first engine run.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.