KitLog pro

Powered By Kitlog Pro v2.0

Tom's Rans S-19 Builders Log
' style=
Date:  1-1-2011
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Forward fuselage floorboard assembly

Assembled forward fuselage floorboard as follows:

1. Prepped and primed floor ribs, channels, inspection plate, and bottom of floorboard skin.

2. Riveted floorboard frame together.

3. Riveted floorboard skin in place on frame, using sand bags to hold things straight.

4. Mounted brake cylinder mount brackets using #8 hardware

5. Mounted nutplates on floorboard and attached floorboard inspection panel with #8 stainless machine screws.

6. Attached brake cylinders to mount brackets per Rans parts manual.

7. Temporarily ounted rudder pedal bearing blocks in preparation for fitting of rudder pedals.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.