KitLog pro

Powered By Kitlog Pro v2.0

Tom's Rans S-19 Builders Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  6-5-2010
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Initial Assembly of LH Aileron Frame

Performed inital assembly of the LH aileron frame per the Rans manuals. Details as follows:

1. Assembled ribs to center aileron stations on aileron spar using 3/32 cleco's.

2. Cleco'd hinge halves in place - these were fabricated and drilled to 3/32 during LH wing frame assembly.

3. Separated sections of the spar reinforcment plate (KPAL0072) using a dremet tool, then polished the edges on the scotchbrite wheel.

4. Fabricated the .025 shim per Figure 04A-05.

5. Assembled parts to the outboard rib station to the spar, drilling as required to 3/32 and cleco'd in place.

6. Assembled parts to inboard rib station to the spar, drilling as required to 3/32 and cleco'd in place.

7. Drilled all rivet holes to 1/8, with the exception of the nut plate attach holes.

The LH aileron frame is ready for disassembly, deburring, edge polishing, and priming.
' style=

LH Aileron - Outboard End

LH Aileron - Outboard End

' style=

LH Aileron - Inboard End

LH Aileron - Inboard End

' style=

Ready for the next step

Ready for the next step

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.