KitLog pro

Powered By Kitlog Pro v2.0

Tom's Rans S-19 Builders Log
' style=
Date:  12-3-2011
Number of Hours:  6.00
Manual Reference:  
Brief Description:  More final assembly tasks

Continued final assembly as follows:

1. Removed Dynon D180 to troubleshoot CHT indication problem . Found that the +5V excitation voltage was not present on the CHT sender leads. Wired both CHT leads to receive the +5V excitation via 1.21K ohm resistors. Re-installed Dynon D180 display.

2. Troubleshot minor fuel leaks along the inside of the firewall. Resealed and tightenend two flare fittings. Pressurized fuel system and re-checked.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.