KitLog pro

Powered By Kitlog Pro v2.0

Tom's Rans S-19 Builders Log
' style=
Date:  9-3-2010
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Completion of LH flap

Completed final riveting of the LH flap per the Rans construction manuals:

1. Deburred rivet holes, prepped an primed skin and frame.

2. Using flat lumber and finger pressure, took some of the bend out of the leading edge for a better fit agains the leading edge ribs.

3. Cleco'd skin to frame except for the leading edge. Positioned assembly on three 4x4 PVC posts and riveted both sides.

4. Cleco'd the leading edge, then riveted, working outward from the center. Riveting was accomplished with the assembly upside down for better visibility of the rib tab position.

5. Did not rivet the flap fillet on the inboard bottom rib line as this needs to be done during final assembly of the aircraft.
' style=

The leading edge fit is OK, not great but OK

The leading edge fit is OK, not great but OK

' style=

The fillet will be added during final aircraft assembly

The fillet will be added during final aircraft assembly

' style=

Ready for storage after the skin plastic is removed

Ready for storage after the skin plastic is removed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.