KitLog pro

Powered By Kitlog Pro v2.0

N2C...CruZer
' style=
Date:  7-29-2016
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Deburring, Stiffeners, Fuel tank

First I filled the right fuel tank with 15 gallons of avgas, then hooked up the 12 volt power supply and the gauge to make sure the sender worked properly...it did. Hopefully tomorrow the fuel is still in the tank and there are no leaks. [Update: The tank held fuel for two days with no leaks.]

Endless deburring today of the bottom skin, both leading edges and the bottom of the main spar. No fun but it has to be done. Also primed the inside rivet lines w/Cortec...love this stuff as compared to paint. Easy on and dries fast but that doesn't matter as you can rivet things together while i'ts still wet.

Drilled then riveted in the stiffener strips (which I made at the same time as those for the left wing). These are a pain in the ass and if I had to do it all over again I would make a single strip down the middle that became part of the structure...handling the 8 pieces...off and on...and drilling...a real pain.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.