KitLog pro

Powered By Kitlog Pro v2.0

N2C...CruZer
' style=
Date:  12-17-2017
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Steel Bungee

So my good friend Al had some solid 5/8" stainless steel rod and gave me a piece. I put it in the lathe and took off about 1/16" on about a 1" wide section in the middle. Installed with cotter pins and did a dry test fit of the nose gear...plenty of space. Love the steel bungee, far superior to the regular bungee.

Warning: If you have the steel bungee, install it prior to installing the engine mount.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.