Powered By Kitlog Pro v2.0
Mikes RANS S-19 Project
S-19 Venterra
Stabilator
8-7-2009
< Previous Log Entry
Next Log Entry >
Date:
8-7-2009
Number of Hours:
1.00
Manual Reference:
Text Manual 02B-1
Brief Description:
Rounded Stabilator Spar Bars
Used a bench grinder to round the edges of the Stabilator Spar Bars as shown in Figure 02B-04. Smoothed this edge using a 3M polishing wheel.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Venterra Home
All
Empennage
Reference Materials
Rudder
Stabilator
Tools
Vertical Stabilizer
Worktable
Copyright © 2001-2013 Matronics. All Rights Reserved.