Powered By Kitlog Pro v2.0
Mikes RANS S-19 Project
S-19 Venterra
Stabilator
4-8-2013
< Previous Log Entry
Next Log Entry >
Date:
4-8-2013
Number of Hours:
0.75
Manual Reference:
Text Manual 02B-2
Brief Description:
Drilled and Clecoed #30 Stabilator Top Right
Drilled and Clecoed #30 Stabilator Top Right.
Did not drill the aft edge where the servo tab hinges go. Waiting on the servo tab hinge doubler parts to arrive.
Drilled and Clecoed #30 Stabilator Top Right
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Venterra Home
Category
# Logs
# Hours
All
104
128
Empennage
3
2
Reference Materials
1
Rudder
24
33
Stabilator
51
57
Tools
1
Vertical Stabilizer
23
36
Worktable
1
Copyright © 2001-2024 Matronics. All Rights Reserved.