Powered By Kitlog Pro v2.0
Mikes RANS S-19 Project
S-19 Venterra
Vertical Stabilizer
1-1-2009
< Previous Log Entry
Next Log Entry >
Date:
1-1-2009
Number of Hours:
0.25
Manual Reference:
Text Manual 02-2
Brief Description:
Verify VS Frame is Flat With Table
Measured from work surface to center of vertical stabilizer front spar, rear spar and ribs. The purpose is to verify that the vertical stabilizer frame is flat (parallel) to the work surface.
Measure from Table to Spar Center
Measure from Table to Spar Center
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Venterra Home
Category
# Logs
# Hours
All
104
128
Empennage
3
2
Reference Materials
1
Rudder
24
33
Stabilator
51
57
Tools
1
Vertical Stabilizer
23
36
Worktable
1
Copyright © 2001-2024 Matronics. All Rights Reserved.