Powered By Kitlog Pro v2.0
Mikes RANS S-19 Project
S-19 Venterra
Vertical Stabilizer
10-17-2008
< Previous Log Entry
Next Log Entry >
Date:
10-17-2008
Number of Hours:
4.00
Manual Reference:
Text Manual 02-1
Brief Description:
Assembled Front Spar Assembly
Identified parts in the Vertical Stabilizer Assembly.
Pressed Flange Bushings into the upper and lower Vertical Stabilizer hinges.
Assembled the front spar and transfer drilled all holes to #30.
Front Spar Assembly Photo 1
Front Spar Assembly Photo 2
Front Spar Assembly Photo 3
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Venterra Home
Category
# Logs
# Hours
All
104
128
Empennage
3
2
Reference Materials
1
Rudder
24
33
Stabilator
51
57
Tools
1
Vertical Stabilizer
23
36
Worktable
1
Copyright © 2001-2024 Matronics. All Rights Reserved.