Powered By Kitlog Pro v2.0
Mikes RANS S-19 Project
S-19 Venterra
Empennage
5-23-2008
< Previous Log Entry
Next Log Entry >
Date:
5-23-2008
Number of Hours:
0.50
Manual Reference:
Brief Description:
Received Empennage Kit
The FedEx truck finally arrived with my Empennage Kit! The crate was in good condition, except for one place that had been "punctured". I opened the crate while the FedEx driver was still there--no damage to the parts inside.
Arrived by FedEx Freight
FedEx Driver Helped Unload
Checking For Any Damage
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Venterra Home
Category
# Logs
# Hours
All
104
128
Empennage
3
2
Reference Materials
1
Rudder
24
33
Stabilator
51
57
Tools
1
Vertical Stabilizer
23
36
Worktable
1
Copyright © 2001-2024 Matronics. All Rights Reserved.