Powered By Kitlog Pro v2.0
Cheetah XLS Web Site
Cheetah XLS
All
11-30-2007
< Previous Log Entry
Next Log Entry >
Date:
11-30-2007
Number of Hours:
0.16
Manual Reference:
Page 064
Brief Description:
Front fork installation
The bolt is run through the front fork and gets attached to the rudder pedals. See how the bushing floats up and down. This is for the stearable nose wheel.
Note the bolt that runs through the bushing
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cheetah XLS Home
All
Avionics
Cockpit
Control linkages
Empennage
Engine
Fuselage
Landing Gear
Pre Assembly
Tools
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.