This assembly went really well; although I had to enlist the help of my wife (Cyndi) to measure the tube lengths (measure 3 times then measure again just to be sure). The hardest part was getting the clamp installed. Needle nose vice grips were the only thing that I came up with to clamp it together enough to get the nut started, but it's done now.
installed main break line through tunnel
It was a little tricky, but managed to get the clamp in place