KitLog pro

Powered By Kitlog Pro v2.0

Mark's Web Site
' style=
Date:  7-21-2014
Number of Hours:  2.00
Manual Reference:  11-05
Brief Description:  Servo tray - round 2 (11-05)

Spent a little more time prepping the tray and making a block of wood that fit perfectly in the tray and supported the flange. Also, even though the direction call out to rivet the doublers on first before final sizing, I just held them in place with clecos and match marked everything. I wanted to be able to clean out the chips and deburr the edges slightly. The drill press worked great. It turned out real nice, although I still haven't pressed in the bushings.
' style=

Drill press was a much beeter way to final size the .25 holes

Drill press was a much beeter way to final size the .25 holes

' style=

Second try turned out great

Second try turned out great

' style=

Servo attached and ready for bushings

Servo attached and ready for bushings

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.