KitLog pro

Powered By Kitlog Pro v2.0

Miguel Vidal RV-8
' style=
Date:  9-23-2014
Number of Hours:  1.60
Manual Reference:  8s7-1r11 7-8
Brief Description:  Closing and Finishing the Tank (LH)

Used Proseal to create a fillet around Fuel Filler neck flange. Cleaned excess sealant from vent tube after installation.

Tightened Flop tube, vent line, and fuel return fittings to torque, and covered their surface with proseal to avoid leaks .
Discarded the T-407 cork gasket provided.

Installed T-411 cover plate to inboard rib using proseal and AN515-8R8 (MS35206-245) Machine Screws.
' style=

Sealing filler neck

Sealing filler neck

' style=

Flop tube, Fuel Return Line, and Vent Line tightened to torque and sealed

Flop tube, Fuel Return Line, and Vent Line tightened to torque and sealed

' style=

Cover plate installed with sealant

Cover plate installed with sealant

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.