Prepped parts for primer and final assembly. Riveted nutplates and installed the two bolts in each of the Sear Ramp Supports, tightening the bottom bolts finger tight at this time per instructions. Torqued previous bolts to 35 in/Lb and applied torque seal. Riveted F-804G-1 Center Section Vertical Bars to the F-804B-2 Center Section Fwd Bulkhead Subassembly.