Brief Description: Wire, Switches, Fuses, and Connectors (LH)
Worked on electrical wiring in LH wing.
Drilled holes and installed nylon adel clamps to outboard LH LE rib to hold duckworks HID LE landing light ballast wires: Drilled two #19 holes 1.0" inboard from LE skin and 1.0" distance (front hole) from stiffening crease and (aft hole) from main front spar.