KitLog pro

Powered By Kitlog Pro v2.0

Miguel Vidal RV-8
' style=
Date:  6-10-2014
Number of Hours:  3.70
Manual Reference:  8s7-1r11 7-7
Brief Description:  Assembling and Sealing the Tank (LH)

Fay sealed all inner ribs and held with 100% clecos.
Fabricated flop tupe anti-hangup guide out of .030" 5/8" wide aluminum strip as shown in DWG 16A.
Drilled holes and clecoed in position for proseal.
' style=

Smeared sealant inside Fuel Tank skin and Fuel Tank rib flanges.

Smeared sealant inside Fuel Tank skin and Fuel Tank rib flanges.

' style=

Installed Fuel Tank ribs and 100% clecos.

Installed Fuel Tank ribs and 100% clecos.

' style=

Fabricated Flop Tube Anti-hangup Guide

Fabricated Flop Tube Anti-hangup Guide

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.