KitLog pro

Powered By Kitlog Pro v2.0

Miguel Vidal RV-8
' style=
Date:  3-22-2012
Number of Hours:  2.90
Manual Reference:  8s6r12 6-2
Brief Description:  Drilling the Horizontal Stabilizer (LH)

Marked all ribs RIGHT SIDE (RH)/LEFT SIDE (LH). Chose LH HS-702,HS-603PP, HS-706, HS-707, HS-708 to work with.
Clecoed all pieces together.
Drilled all rib-to-spar attach holes to #30 (except HS-708 to HS-603PP holes as per instructions).
Un-cleacoed, deburred edges, holes and surfaces, and cleaned out chips of every LH piece.
Re-clecoed assembly back together.
Clecoed on the HS-801PP skin.
' style=

All LH pieces

All LH pieces

' style=

All LH pieces clecoed and match drilled #30

All LH pieces clecoed and match drilled #30

' style=

HS-801PP skin clecoed on assembly

HS-801PP skin clecoed on assembly

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.