Spent much of the time getting the HS/Elevator down from storage and putting it back up afterwards. Attached the left elevator then right elevator to drill the holes required in the pitch horns. Seems like a lot of time and prep to drill 4 holes, but deburred them and temporarily attached all the mounting hardware as it will all need to come apart again for the final installation.
My spacer count came out to 1 thick spacer on the right pitch horn and 1 thin spaceer on the left pitch horn for spacing with the roller bearing