KitLog pro

Powered By Kitlog Pro v2.0

Flying Lead RV-14A
' style=
Date:  10-13-2019
Number of Hours:  4.10
Manual Reference:  29-4
Brief Description:  Fwd Mid Fuselage Side Structure

Probably spent more time than necessary putting the structure on its side since the bulk of the riveting needed the steel landing gear braces removed. Since the braces were removed I didn't feel safe putting it on its side so I simply riveted from the bottom. Not the easiest, but done.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.