KitLog pro

Powered By Kitlog Pro v2.0

Flying Lead RV-14A
' style=
Date:  9-7-2019
Number of Hours:  3.80
Manual Reference:  26-3 to 26-7
Brief Description:  Mid Fuselage Lower Structure

Finished Alodining the lower skins before then continuing with section 26. Did this section with very few surprises. Lots of nutplates and attachment of the ribs to the bulkhead. Made the mistake of putting in the bolts the wrong direction which made redoing them a little time consuiming, but no issues. Had one rivet where the gun head skipped, but otherwise flawless -4 rivets in the spar.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.