Powered By Kitlog Pro v2.0
Flying Lead RV-14A
RV-14A
All
5-20-2019
< Previous Log Entry
Next Log Entry >
Date:
5-20-2019
Number of Hours:
3.80
Manual Reference:
18-5
Brief Description:
Fuel Tanks
Installed the baffles on the left fuel tank. It definately gets faster with less wasted proseal the more I am doing it, but remains messy. Will let these all dry before continuing with the J-stiffener. Page 18-5 sure does take a long time.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-14A Home
Category
# Logs
# Hours
All
205
896
Avionics
1
75
Avionics/Electrical
3
8
Electrical
3
8
Empennage
80
298
Fuselage
42
175
Miscellaneous
1
0
Paint & Paint Prep
2
8
Wings
73
324
Copyright © 2001-2024 Matronics. All Rights Reserved.