KitLog pro

Powered By Kitlog Pro v2.0

Flying Lead RV-14A
' style=
Date:  5-5-2019
Number of Hours:  4.60
Manual Reference:  18-2 to 18-4
Brief Description:  Fuel Tanks

After a solid 2 weeks of airplane on hold to build a patio and firepit in the backyard, I finally got around to alodining the fuel tanks. I tried a new method for metal prep which worked fairly well. For small parts I wash in a large batch with bon ami and water before final wipe down with degreaser. For large pieces I scuff and wipe clean with denatured alcohol before final wipedown with degreaser. Both methods seems to work, but the key factor remains minimal time from scuffing to priming / Alodining.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.