Powered By Kitlog Pro v2.0
Flying Lead RV-14A
RV-14A
All
2-4-2019
< Previous Log Entry
Next Log Entry >
Date:
2-4-2019
Number of Hours:
0.40
Manual Reference:
12-6 to 12-7
Brief Description:
Empennage Fairings
Applied the flox joint to the inside of the tip fairings followed by two layers of fiberglass cloth. Will let it dry and finish sanding tomorrow. Almost done, lots of waiting for epoxy to dry.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-14A Home
Category
# Logs
# Hours
All
205
896
Avionics
1
75
Avionics/Electrical
3
8
Electrical
3
8
Empennage
80
298
Fuselage
42
175
Miscellaneous
1
0
Paint & Paint Prep
2
8
Wings
73
324
Copyright © 2001-2024 Matronics. All Rights Reserved.