KitLog pro

Powered By Kitlog Pro v2.0

Flying Lead RV-14A
' style=
Date:  1-2-2019
Number of Hours:  5.60
Manual Reference:  12-2 to12-5
Brief Description:  Empennage Fairings

After installing a washer in the horizontal stabilizer pitch horn that I forgot previously before starting on the fiberglass. Steep learning curve on how to effectively cut and shape the fiberglass, but ultimately it reacts more like wood than anything else. Made a couple cutting mistakes, but luckily nothing that required starting over. I did accidentally cause a partial crack (not all the way through) along the upper rudder fairing, but will epoxy that back together once the temperatures warm up since it is a not a structural piece. Will continue with the bottom rudder fairing tomorrow.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.