KitLog pro

Powered By Kitlog Pro v2.0

Flying Lead RV-14A
' style=
Date:  1-1-2019
Number of Hours:  4.60
Manual Reference:  10-28 and 11-6
Brief Description:  Aft Fuselage

Finished the electrical rough in with the installation of wiring for the Artex ELT and wired the pitch trim servo wires to their CPC connector plug. Made the initial assembly of the aft fuselage, horizontal stabilizer and vertical stabilizer. Drilled the 1/4 inch holes for the horizontal stabilizer and will disassemble and debur tomorrow. I will likely start cutting the fiberglass tomorrow as well. Too cold to mix epoxy, but can prep the fiberglass in perperation for warmer temperatures. Still waiting on wash primer before riveting the aft deck and upper fuselage skins.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.